Surrey-Langley SkyTrain must be prioritized ahead of Massey Tunnel replacement
The 16km Surrey-Langley SkyTrain is the region’s highest unfunded transportation priority, ahead of a George Massey tunnel replacement bridge.
The 16km Surrey-Langley SkyTrain is the region’s highest unfunded transportation priority, ahead of a George Massey tunnel replacement bridge.
Never-before-seen emails and traffic models show that a surface-running Edmonton LRT Line could cause daily traffic jams in excess of 1.5 kilometres long.
We are calling on the BC Liberals and BC Greens to match the BC NDP’s commitment to fund a full 16km Surrey-Langley SkyTrain and get it built in a single phase.
Support for SkyTrain was verified with the “second greatest number of responses in the history of TransLink engagements”
Support for SkyTrain was verified with the “second greatest number of responses in the history of TransLink engagements”
The only way to reduce congestion on the Port Mann Bridge is to convert trips from driving to transit by building more SkyTrain
Support for the Surrey Langley SkyTrain was verified with the “second greatest number of responses in the history of TransLink engagements”
Support for SkyTrain was verified with the “second greatest number of responses in the history of TransLink engagements”
Support for SkyTrain was verified with the “second greatest number of responses in the history of TransLink engagements”
TransLink is proposing the introduction of dedicated bus priority lanes in Langley City and significant improvements to Fraser Highway bus service as a precursor to SkyTrain.