SkyTrain for Surrey, not LRT!

The space required by an at-grade LRT will require hundreds of property takes.

An estimated 214 property takes will be required on Fraser Highway alone (including at least 20 full takes)
  • LRT’s at-grade footprint is more than twice as much as a SkyTrain guideway
  • Widened roadways will be more difficult to cross from end to end

The Evergreen Line's guideway passes freely over a White Spot in Burnaby.

SkyTrain’s flexibility can allow for less disruption of existing properties.
This example is on the Evergreen Line.
Takes up more space • Property acquisition