SkyTrain for Surrey, not LRT!

Financial details for Surrey Rapid Transit, reported in the TransLink/MOTI joint studyCosts the same to build now, and less to operate in the long term.

  • Lower operating costs thanks to better transit technology and higher farebox recovery
  • Less chance of service cutbacks and loss of service
  • Significantly lower cost per added rider
  • Significantly lower cost per person-hour saved
Lower long-term costs